Bunkers are one of the most cost-effective ways to hold large volumes of grain on farm, but their performance is set long before the first load arrives. It is set by the foundation, the pad the whole bunker sits on.

A correctly designed pad does not manage water. It removes the opportunity for water to accumulate anywhere. Rain moves off the cover, off the surface, away from the toe of the stack and stays clear of the storage area. Once that profile is built and compacted, wet-season grain quality stops being a variable you monitor, but an outcome you have already decided.

Six decisions determine whether a pad performs that way: where it sits, how far it is raised above surrounding ground, what camber runs across it, what gradient runs along it, how well it is compacted and where the runoff goes once it leaves the tarps. All six are made before any grain arrives, and all six are expensive to change afterwards.

Water Damage in a Bunker Is a Design Outcome

When grain spoils along the base of a stack or a soft patch appears mid-bunker, the cause is almost never the tarp. It traces back to one of five decisions made during construction:

  • A pad level with, or below, surrounding ground: Every millimetre of rain falling on the paddock around it has to go somewhere and with nowhere lower to run to, the pad becomes the collection point.
  • No fall across or along the pad: A flat surface does not drain. Water that reaches the ground sheet has no exit path and wicks into the base of the stack.
  • Inadequate compaction: Loaded trucks rut soft ground and those ruts become channels and low points that hold water permanently.
  • An uneven fill profile: Dips, hollows or a flat top let rainwater pond on the cover rather than run off it.
  • No runoff provision at the base: A large bunker sheds an enormous volume of water off its covers during a storm, and without formed drainage all of it lands in a ring at the toe of the stack.


Each of these is a design fault, not a weather event. The rest of this guide addresses them in the order you would build the pad.

A grain bunker with concrete walls being setup beside silos with headers running during harvest

Step 1: Select a Site That Drains Without Help

Site selection is the cheapest and most-effective drainage work available, because good country does most of the job before any earth is moved.

Look for:

  • Naturally elevated ground, well clear of natural water courses, drainage lines and low points that collect run-on water from the surrounding paddock.
  • All-weather truck access, so grain can be shifted during and after a wet period rather than only in dry conditions.
  • Sufficient working room to manoeuvre augers, trucks and machinery safely around the full length of the bunker.


Orientation is part of the same decision. Positioning the closed end of the bunker into the prevailing wind reduces wind loading and lift on the covers, which protects the tensioned profile that sheds water in the first place.

Growers who get this right tend to describe it the same way. Avondale Farms at Terrappee in northern Victoria now runs three bunkers on a site chosen for its natural fall away from the grain face and rates drainage as the precondition for the whole system working.

Step 2: Raise the Pad Above Surrounding Ground Level

This is non-negotiable. The pad must sit above the surrounding ground so natural drainage moves water away from the grain rather than toward it.

On sloping land, a well-chosen site may already provide most of the required elevation. On flat regions, the pad has to be built up, either by importing material or by cutting and filling on site. Taking that material from immediately around the pad achieves both objectives at once: the pad rises and the ground beside it drops, establishing a fall away from the storage footprint before any drainage channels are formed.

A grain bunker with raised earth walls and concrete tyres to keep the ground sheet in place

Step 3: Build in a Camber Across the Pad

Prepare the pad with a slight camber to either side and a small rise through the centre. This crown moves any moisture that reaches the surface out to the edges instead of lettingit track lengthways beneath the stack, where it has no way out and stays in contact with the grain the longest.

The volume of earthworks involved is small. It repays itself the first time the site takes an unexpected 40mm of rain.

Step 4: Set a Constant Gradient Toward the Open End

Along the length of the bunker, maintain a gradient of at least 0.8% toward the open end, so rainfall drains away from the grain face rather than pooling against it.

Consistency matters as much as the number. Inconsistent grades create intermediate low spots that trap water in the middle of the pad, which is the hardest place to detect a problem and the most expensive place to have one. Set the grade with a machine that can hold it and check it across the full length before the ground sheet goes down.

Step 5: Compact the Surface to Hold the Profile

The pad must be compacted well enough to sustain loaded trucks and machinery without rutting.

Compaction is what protects everything built in the previous three steps. A pad that holds its shape keeps shedding water for years. A soft one loses its camber in the first wet week of harvest, and the ruts that replace it channel water directly under the stack. Compaction also determines whether the site remains trafficable when you most need to move grain out.

One complete grain bunker beside a new bunker being constructed

Step 6: Form Drainage Around the Base

The final element is a drainage area around the base of the pad to receive and divert runoff coming off the tarps.

  • On sites where the natural topography carries water away, this may be minimal.
  • On flat sites, formed drainage channels are required to carry water clear of the storage area entirely, not merely away from the immediate toe of the stack.


Position drainage lines and any pits away from high-traffic areas so trucks and augers are not running across them and progressively destroying the profile.

Specify the Ground Sheet as Part of the Pad

A well-built pad still needs a barrier between the ground and the grain. Ground sheets laid across the entire pad before filling are standard practice for two reasons: they stop residual ground moisture migrating up into the base of the stack, and they prevent contamination and physical grain loss into the soil.

Treat the ground sheet as a specified component of the pad rather than an optional extra. It is a small investment against losing the bottom layer of a 1,000-tonne stack.

Size the Structure Before You Move Dirt

Wall options belong in the design stage, not after the pad is built. Earth, concrete or modular poly walls increase the capacity you can store on the same footprint, and they change the pad dimensions you need.

Rounding the ends to match the auger’s natural filling shape is a common way growers gain capacity without moving to larger tarps. You can model capacity, footprint and cover requirements before you turn a sod with the grain bunker calculator.

Filling and Covering: Protecting the Profile You Built

The pad manages water from below. Filling technique and a correctly tensioned bunker cover manage water from above, and a smooth fill profile is the reason water never sits on the tarp in the first place.

  • Fill evenly and smoothly. Move the auger in small increments to build a continuous ridge along the top, free of the depressions where water ponds.
  • Match the shape to the auger. Round ends suit the auger’s natural loading pattern and reduce awkward hollows at the extremities.
  • Cover progressively. A full bunker is not a prerequisite for covering. Cover as filling advances so a sudden forecast cannot catch the site out.
  • Never handle large tarps in wind. They become unmanageable and dangerous very quickly.
  • Tension the cover properly, so water runs off cleanly rather than sitting in slack folds and loading the fabric.

For the full step-by-step process, the grain bunker construction guide collects proven practice from growers and bulk handlers around the country, and the construction and operation video walks through the setup visually. Ahead of each season, work through the checks that get a bunker ready before the first truck arrives.

Is the Earthworks Investment Worth It?

A properly designed pad carries an up-front cost, and it should be assessed against the alternative rather than against zero.

Bouts of heavy rain can spoil enough grain to exceed the entire earthworks bill, and a poorly drained pad continues to cost money every wet season it remains in service. Bunker storage typically runs at a fraction of the cost of vertical storage per tonne per year, but those economics only hold if grain comes out in the condition it went in. We break the numbers down in our comparison of grain storage cost efficiency.

Growers who have moved from single-use grain bags to reusable bunkers, including a 25,000-tonne wheat operation at Esperance in WA, consistently identify the pad as the component worth doing properly the first time.

Frequently Asked Questions

  • How much fall should a grain bunker pad have?
    Maintain a gradient of at least 0.8% along the pad toward the open end, so rain drains away from the grain face, plus a slight camber either side of a central rise so surface water sheds to the edges. Keep both grades constant along the full length.

  • Does a bunker pad need to be raised above surrounding ground?
    Yes. A pad level with or below the ground around it collects run-on water from the surrounding area. Raising the pad is what makes natural drainage work in your favour rather than against you.

  • Can I build a bunker on flat ground?
    Yes, with additional earthworks. On flat sites the pad must be built up above surrounding ground and formed drainage channels are needed to carry runoff clear of the storage area, because the natural topography will not do it for you.

  • Do I need a ground sheet if my pad drains well?
    Yes. Even a well-drained pad transmits ground moisture upward, and bare ground causes contamination and grain loss at the base of the stack. Ground sheets laid across the whole pad before filling are standard practice.

  • How do I stop water pooling on top of the cover?
    Control the fill profile. Depressions and flat spots in the grain surface let water collect on the tarp instead of running off. Build a smooth, even ridge with the auger and keep the cover correctly tensioned throughout the storage period.


Get the Pad Right First

A well-designed pad and a quality cover are what separate grain that stores predictably from grain that spoils. For over three decades, Polytex has manufactured high-strength bunker tarps and ground sheets for Australian growers and bulk handlers, and we work with sites at the planning stage rather than after the first wet season.

Browse the on-farm grain bunker packages or contact the team on 1300 059 003 for a custom quote and free advice on planning your storage.